Alexander Condon | Project Manager
  • HOME
  • PORTFOLIO
  • PRICING
  • EXPERIENCE
  • CONTACTS
Alexander Condon | Project Manager
Alexander Condon | Project Manager

As an accomplished project leader with over four years of experience, I have a proven track record of delivering high-quality projects on time and within budget.

  • HOME
  • PORTFOLIO
  • PRICING
  • EXPERIENCE
  • CONTACTS

Featured posts

marketing-young-cute-business-lady-striped-shirt-office-showing-raising-results (1)
The Best Ways to Do Market Research
  • September 7, 2021
  • 4 min read
pretty-curly-young-woman-writing-notes-startup-project
The Easiest Way to Become a Successful
  • September 7, 2021
  • 4 min read
road-sign-direction-perforated-paper-arrow
The Quickest Way to Deliver Your Message?
  • September 7, 2021
  • 4 min read

Categories

  • Development
  • Gallery
  • Quote
  • Technician

Find Me

Tags

Art Beautiful Fashion Happy Love Move Photography Travel
Portfolio
66

G.H. Palmer – Multifamily Community Development

G.H. Palmer – Multifamily Community Development

Project Engineer
09/2020 – 09/2022

LIKE THIS 66
request for information
  • 996 Residential Units, 37,500 Square Feet of Commercial Retail Space, and 5 Acres of Neighborhood Parks
  • $3M In Contracted Value
  • Over 1,900 Stone Columns Installed for Lateral Spread Mitigation
  • Extensive Shoring Systems with Multi-Level Tieback Earth Retention Systems
Wet Shaft Drilling
Stone Columns Installation
Site Overview
Finished Wall
Finished Wall
Portfolio
74

Hensel Phelps – Delta Skyway Terminals | At LAX

Hensel Phelps – Delta Skyway Terminals | At LAX

Field Engineer
05/2020 – 09/2020

LIKE THIS 74
request for information
  • Project Value Exceeding $1 Billion at Terminal T3
  • Fast-track Construction with $200M Change Order to Accelerate Construction Phasing
  • Formally educated on Procore Management Platform
  • Learned a Great Deal About Layout, How to Effectively Read Drawings, Manage Subcontractors
Cohesive Teamwork
Total Station Survey
Shear Wall Footing Pad
Footing Checks
Footing Checks
Shear Wall Footing
Roof Overlook
Roof Overlook
Steel Erection
Steel Erection
Tarmac Reinforcement
Tarmac Reinforcement
Portfolio
70

City of San Diego – Morena Pump Station

City of San Diego – Morena Pump Station

Asst Project Manager
09/2020 – 09/2022

LIKE THIS 70

request for information

  • Project Value: $12M
  • Originally Contracted for $2.4M Ground Improvement and Shoring Scope
  • Granted a $10M Change Order to Proceed with an Internally Braced Jet Grout Plug Shoring System
  • 478ea Jet Grout Columns Installed
  • 160ea Triple Soil-Mix Panels Created
  • Over 10,000 Tons of Cement Used in total on the Project
Self Perform Survey
 
Stone Column Installation
 
Shoring Installation
 
Tieback Testing
 
Dawn to Dusk
 
Batch Plant Setup
 
Compaction Grouting

Posts pagination

  • 1
  • 2
Alexander Condon | Project Manager Alexander Condon | Project Manager

© 2025. All Rights Reserved by Alexander Condon