Alexander Condon | Construction Consultant
  • HOME
  • SERVICES
  • PRICING
  • PORTFOLIO
  • ABOUT ME
  • CONTACT
Alexander Condon | Construction Consultant
Alexander Condon | Construction Consultant

As an accomplished project leader with over four years of experience, I have a proven track record of delivering high-quality projects on time and within budget.

  • HOME
  • SERVICES
  • PRICING
  • PORTFOLIO
  • ABOUT ME
  • CONTACT

Featured posts

marketing-young-cute-business-lady-striped-shirt-office-showing-raising-results (1)
The Best Ways to Do Market Research
  • September 7, 2021
  • 4 min read
pretty-curly-young-woman-writing-notes-startup-project
The Easiest Way to Become a Successful
  • September 7, 2021
  • 4 min read
road-sign-direction-perforated-paper-arrow
The Quickest Way to Deliver Your Message?
  • September 7, 2021
  • 4 min read

Categories

  • Development
  • Gallery
  • Quote
  • Technician

Find Me

Tags

Art Beautiful Fashion Happy Love Move Photography Travel
Portfolio
67

Sharp – Coronado Hospital Seismic Retrofit

Sharp – Coronado Hospital Seismic Retrofit

Asst Project Manager
06/2021 – Current

LIKE THIS 67
  • $1.6M Project Value
  • Operating outside an Active Hospital for Structural Seismic Retrofit Upgrade
  • Completed HCAI Submittals
  • Created Detailed Working Plans Due to Lack of Working Space and Pedestrian Zones
  • Installed Augercast Piles 24-30" Dia. to a 50-60' Depth
  • Installed Micropiles 12" Dia. to a 50' Depth
  • Conducted 3 Load Test Programs Using ASTM Standards
request for information
AutoCad Working Plan
Load Test Program
Reinforcement Staging
Finished Piles
Portfolio
80

City of San Diego – West Mission Bay Bridge Replacement 

City of San Diego – West Mission Bay Bridge Replacement 

Project Engineer
09/2020 – 05/2021

LIKE THIS 80
  • Project Scope Value: $22.08M
  • First Field Project Assignment at CJA
  • Installed 10' Dia. CIDH Bent Piles 160 Feet to Tip. 6' Dia. CIDH Abut. Piles 120 Feet to Tip
  • Learned how to Create a Critical Pick Plan
  • On-Site doing Live Concrete Pour Logs Tracking Tremie Heads and Doing QC/QA Activities
request for information
Casing Break
Submersible Camera
Exporting Spoils
Picking Casing Section
Concrete Pour Log
Cage Hoisting Plan
Construction Detail
Pile Acceptance Testing | CSL Graph
Finished Abutment Piles
Portfolio
76

Oppidan – The Hacienda Mission San Luis Rey

Oppidan – The Hacienda Mission San Luis Rey

On-Site Project Engineer
09/2021 – 11/2021

LIKE THIS 76
  • Value of Project Scope: $1.8M
  • 212 Unit, High End, Senior Living Community
  • Contracted to Install 278 Deep Soil Cement Columns 5' Dia. up to 73' Deep
  • 12,000+ Gallons of Diesel Fuel Consumed
  • Over 4,200 tons of Cement Powder Used
  • Accrued A Total of 4,550 Man Hours of Which 1/3 Were OT
request for information
Load Test Program
Mission San Luis Rey in Background
Production Operation
Site Overlook
Greasing The Rotary
CDSM Layout
Tooling Size
Portfolio
78

G.H. Palmer – Multifamily Community Development

G.H. Palmer – Multifamily Community Development

Project Engineer
09/2020 – 09/2022

LIKE THIS 78
  • 996 Residential Units, 37,500 Square Feet of Commercial Retail Space, and 5 Acres of Neighborhood Parks
  • $3M In Contracted Value
  • Over 1,900 Stone Columns Installed for Lateral Spread Mitigation
  • Extensive Shoring Systems with Multi-Level Tieback Earth Retention Systems
request for information
Wet Shaft Drilling
Stone Columns Installation
Site Overview
Finished Wall
Finished Wall
Portfolio
85

Hensel Phelps – Delta Skyway Terminals | At LAX

Hensel Phelps – Delta Skyway Terminals | At LAX

Field Engineer
05/2020 – 09/2020

LIKE THIS 85
  • Project Value Exceeding $1 Billion at Terminal T3
  • Fast-track Construction with $200M Change Order to Accelerate Construction Phasing
  • Formally educated on Procore Management Platform
  • Learned a Great Deal About Layout, How to Effectively Read Drawings, Manage Subcontractors
request for information
Cohesive Teamwork
Total Station Survey
Shear Wall Footing Pad
Footing Checks
Footing Checks
Shear Wall Footing
Roof Overlook
Roof Overlook
Steel Erection
Steel Erection
Tarmac Reinforcement
Tarmac Reinforcement
Portfolio
82

City of San Diego – Morena Pump Station

City of San Diego – Morena Pump Station

Asst Project Manager
09/2020 – 09/2022

LIKE THIS 82

request for information

  • Project Value: $12M
  • Originally Contracted for $2.4M Ground Improvement and Shoring Scope
  • Granted a $10M Change Order to Proceed with an Internally Braced Jet Grout Plug Shoring System
  • 478ea Jet Grout Columns Installed
  • 160ea Triple Soil-Mix Panels Created
  • Over 10,000 Tons of Cement Used in total on the Project
Self Perform Survey
 
Stone Column Installation
 
Shoring Installation
 
Tieback Testing
 
Dawn to Dusk
 
Batch Plant Setup
 
Compaction Grouting